❌

Normal view

AI is driving a data-center power boom. These are some of the biggest US projects being built.

23 October 2026 at 21:00
data centers
The Meta El Paso Data Center on Aug. 13, 2026, in El Paso, Texas.

Brandon Bell/Getty Images

  • Data centers and artificial intelligence have become a part of everyday conversation for Americans.
  • Data center energy consumption has entered those conversations, too.
  • The largest planned AI campuses could require more than 10 gigawatts of electricity.

Some Americans have new next-door neighbors: data centers.

The US has been building these computing facilities for decades, but development has ramped up dramatically in recent years as AI increasingly drives demand for computing power.

Business Insider compiled a list of some of these enormous US data-center projects to illustrate the scale of what's being built. Those on the list have at least 1 gigawatt of capacity and have broken ground.

Among the largest is a city-sized campus in Texas pursuing up to 17 gigawatts of power capacity. Another in Ohio is aiming to have up to 10 gigawatts of data-center capacity, most of which OpenAI has contracted to use. For reference, 1 gigawatt of electricity continuously supplied for a year could power roughly 835,000 average American homes.

In total, the Pew Research Center says the US has more than 3,000 operating data centers nationwide and over 1,500 more under development, mostly in rural areas. According to data from the Energy Institute's 2026 Statistical Review of World Energy, US data centers accounted for nearly 40% of global data-center electricity use in 2025, consuming about 313 terawatt-hours. That's more electricity than all of Australia used that year.

Planned capacity is the closest public proxy for how much computing these AI campuses can support, and that's important because the electricity and water needed to run their servers and cooling systems can have major implications for local grids and sustainability.

Residents affected by developments in places like Texas and Utah have pushed back over concerns about noise, property values, and the effects on nearby communities. New York has temporarily paused the construction of new large-scale AI data centers.

Still, the 2025 US Data Center Energy Usage Report from Berkeley Lab projects that data centers will consume 11.8% of US electricity by 2030, up from about 4.4% in 2023. Oracle, SB Energy, SpaceX, Google, and Meta are among the leading developers and operators.

Elon Musk's SpaceX is so eager to build its supercomputers that it's offering employees a pay bump to temporarily move to the data-center sites to help with the buildout.

Here's a closer look at some of the largest AI data-center campuses being built.

Meta Lebanon Campus — Indiana
The Meta logo.

Thibault Camus/AP

Mark Zuckerberg's Meta currently has 21 data centers under construction. Its Lebanon, Indiana, data center is one of its biggest investments — and the company's second in the state.

The $10 billion center, which broke ground in early 2026, is planned to deliver 1 gigawatt of capacity and span 1,500 acres.

It's expected to be completed by early 2028. Neighbors have complained about light pollution from the construction, while residents across Indiana have urged state lawmakers to regulate the growing data-center industry.

Meta El Paso Data Center — Texas
An aerial view of a data center.
EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas. Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas. Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of

Brandon Bell/Getty Images

Meta's data center in El Paso, Texas, is planned to be powered by 1 gigawatt of capacity and span roughly 1,000 acres. It originally called for $1.5 billion in investment, which later increased to $10 billion.

The center will support more than 300 workers once complete, while around 4,000 construction workers are expected to build it out.

The site broke ground in October 2025 and is expected to be finished in 2028. The site has also sparked backlash from residents.

Project Freebird (Stargate) — Texas
Sam Altman speaks
OpenAI CEO Sam Altman

Bloomberg/Getty Images

Project Freebird is part of Stargate, the AI-infrastructure initiative co-led by OpenAI and SoftBank, which OpenAI said in January 2025 would invest up to $500 billion in US infrastructure.

Freebird will be a 1.2-gigawatt data center campus in Milam County, Texas, near Austin. The first phase was expected to be completed by October, while additional phases are planned through 2028. Construction began in 2025.

However, the company has not issued any update on the data center's completion as of late October.

The site, being developed by SB Energy, a SoftBank-backed infrastructure company, will span roughly 595 acres. Phase 1 has an estimated construction cost of $470 million, while total investment in the broader project is expected to range from $1.8 billion to $3 billion.

The first phase had a scheduled construction-completion date of October 15, while SB Energy says operations are expected to begin in 2027.

Fort Wayne Data Center — Indiana
Google CEO Sundar Pichai delivers a speech during the AI Impact Summit in New Delhi on February 19, 2026
Google CEO Sundar Pichai delivers a speech during the AI Impact Summit in New Delhi in February 2026.

Ludovic MARIN / AFP via Getty Images

In 2024, Google broke ground on a $2 billion data center campus in Fort Wayne, Indiana, to support its AI and cloud operations.

The campus is expected to require up to 1.2 gigawatts of power at full build-out. Some Indiana politicians have expressed concern about the amount of power required to run the data center and who will foot the energy bill.

"If companies want to build a data center here, and we have to build new power generation for them, then they need to share in that risk," Indiana Rep. Ed Soliday, a Republican, previously told Business Insider. "There are a couple of data center folks who have said, 'Oh no, that's not fair.' Yes, it is. Grandma down the street shouldn't have to pay for your dreams."

Stargate Abilene — Texas
An aerial view of a data center campus.
The Stargate AI data center in Abilene, Texas.

Bloomberg/Getty Images

The Stargate AI data center campus outside Abilene, Texas, is expected to deliver 1.2 gigawatts of capacity. Crusoe, the lead developer and builder behind the project, broke ground on the campus in June 2024. The first phase is already operational.

The second phase, which is under construction, is backed by a $15 billion joint venture between Crusoe, Blue Owl Capital, and Primary Digital Infrastructure. It will add six buildings to the campus, bringing the total to eight and the planned capacity to 1.2 gigawatts. The site will span 875 acres.

Nebius AI Factory — Missouri
A man in a shirt speaks.
Danila Shtan, chief technology officer at Nebius. The company is an AI cloud infrastructure provider headquartered in Amsterdam.

Bloomberg/Getty Images

Nebius' data center in Independence, Missouri, will span roughly 400 acres and reach a capacity of up to 1.2 gigawatts. The company broke ground in May and is expected to bring roughly 1,200 construction jobs and 130 permanent jobs.

Nebius has not announced a total investment amount, though the city expects to begin collecting tax revenue from the campus in 2028.

The site hasn't come without controversy. A group of citizens is suing the city of Independence and companies involved with the project, alleging 16 counts, including claims that the city violated Missouri's Sunshine Law several times by failing to provide finalized data center construction plans. Nebius did not offer a comment.

CloudBurst San Marcos Data Center I — Texas
CloudBurst Data Centers and Evolve broke ground.
CloudBurst Data Centers and Evolve Holdings broke ground on the site in late 2025.

Evolve Holdings

CloudBurst's San Marcos Data Center I is a planned 1.2-gigawatt capacity campus on 706 acres in central Texas. Guadalupe County approved a $500 million tax abatement for the project.

The company and its development partner, Evolve, broke ground in November 2025, with an initial 50-megawatt phase expected to be complete by late 2026. Construction is expected to be complete in 2029.

San Marcos residents have protested proposed data centers over water and energy concerns. The city has since become the first in Texas to ban new data centers, though the ban won't stop CloudBurst's project, which is outside city limits.

The Barn Data Center — Michigan
a massive building under construction, surrounded by dirt

Jim West/UCG/Universal Images Group via Getty Images

The Barn, part of the Stargate project, is a multi-billion-dollar AI data center campus in Saline Township, southwest of Ann Arbor, Michigan. Related Digital, a data-center developer, is building the campus for Oracle as part of its partnership with OpenAI. Construction for The Barn began in June.

The campus will comprise three data center buildings with a combined capacity of 1.4 gigawatts. The $16 billion project is backed by Related Digital and investment firm Blackstone. The first facilities are expected to enter service by the end of 2027.

Local residents have protested against the data center, citing concerns about its impact on the grid and pollution.

In October, state regulators opened public comment on a wastewater permit for the campus’s proposed on-site water-treatment system.

Stargate Frontier Campus — Texas
OpenAI's Sarah Friar and Sam Altman stand at a construction site.
OpenAI CFO Sarah Friar (left) and CEO Sam Altman (right) during a media tour of the Stargate AI data center in Abilene, Texas, in 2025.

Bloomberg/Getty Images

The Stargate Frontier Campus, developed by Vantage Data Centers, will be a 1.4 gigawatt, 1,200-acre data center in Shackelford County, Texas, near Albany in north-central Texas.

The campus is part of the broader Stargate initiative led by OpenAI, Oracle, and other partners, and is being designed for ultra-high-density AI workloads. Vantage plans to invest more than $25 billion in the project, which is expected to be fully built out by 2028.

Construction of the center began in late 2025.

xAI Colossus 2 — Tennessee
A swampy lake in the foreground, with construction in the background.
Work continues on a data center being built by SpaceXAI on August 2, 2026 in Southaven, Mississippi. Hastily built to meet the skyrocketing demand for computing power required by the global artificial intelligence race, these data centers are meeting stiff opposition across the United States. In Southaven, 69 turbines are constantly in motion to

Brandon Dill / AFP via Getty Images

Elon Musk's xAI is building Colossus 2 to power Grok, the AI chatbot on X. Construction began in 2025 in Memphis, Tennessee, and the company has said it plans to expand the site to 1.5 gigawatts. The nonprofit research institute Epoch AI estimates its current capacity at about 946 megawatts.

Environmental justice groups, led by the NAACP, sued xAI earlier this year, alleging that the company installed and operated gas turbines that power Colossus 2 in nearby Southaven, Mississippi, without the required air permits. In March, Mississippi regulators approved a permit for xAI to build and operate a new fleet of turbines at the site.

Local residents have filed a class-action lawsuit against xAI, MZX Tech, and SpaceX, alleging that noise and vibrations from the gas turbines have disrupted their lives and harmed their property values.

Still, in late October, Business Insider reported that SpaceX was offering employees a 20% pay bump to temporarily relocate to Memphis or Southaven, Mississippi, for six weeks to help build out Colossus 1 and 2.

Project Jupiter — New Mexico
An aerial view of a data center under construction.
Project Jupiter is located in Santa Teresa, New Mexico

Omar Ornelas/El Paso Times/Reuters

Developed by infrastructure companies STACK Infrastructure and BorderPlex Digital Assets, Project Jupiter will be an AI data center campus in Doña Ana County, New Mexico, near the Texas border. It is part of the Stargate initiative and is expected to support Oracle's AI-computing operations for OpenAI.

Construction for Project Jupiter began in September 2025. The campus's planned on-site power system could include up to 2.45 gigawatts of Bloom Energy fuel cells, replacing an earlier proposal centered on gas turbines and diesel generators.

In May, Oracle ditched its plan to construct a natural gas plant to power Project Jupiter, following local residents' concerns over the potential negative water usage and air pollution effects it could cause.

Oracle issued a force majeure notice in September due to potential delays in the project's power infrastructure, though it says the campus remains on track for 2028.

Meta Hyperion — Louisiana
Aerial view of Richland Parish Data Center
Aerial view of Richland Parish Data Center.

Meta

Meta's Hyperion AI data center in rural northeast Louisiana, backed by more than $50 billion in investment, will span more than 3,600 acres and is planned to deliver 5 gigawatts of capacity once fully developed. Hyperion broke ground in December 2024.

Meta says Hyperion is designed to train and run its artificial-intelligence systems. Earlier this year, Louisiana gave Meta $3.3 billion in tax breaks for Meta to build Hyperion. The project is expected to be completed in the 2030s.

Since the center is located in a rural part of the state, the influx of 7,500 trade and construction workers has spurred a housing boom, with mobile homes built for workers that rent for $3,000 a month.

Still, the project has also faced pushback from local residents and environmental groups concerned about its impact on water, energy use, and the surrounding community.

Louisiana regulators held hearings in October on the proposed power build-out for the campus. The state's Public Service Commission will issue a decision in December.

PORTS-Pike Technology Campus — Ohio
PORTS Technology Campus
Breaking ground at the Portsmouth Site on March 20

US Department of Energy

The Department of Energy said SB Energy broke ground in March in Ohio on the planned AI and cloud campus at the former Portsmouth Gaseous Diffusion Plant, known as PORTS. The campus will span private land and remediated federal land leased from the DOE.

The Nvidia-backed project is expected to include up to 10 gigawatts of data-center capacity, with OpenAI set to use up to 8 gigawatts of it for its workloads.

While the DOE says the historical PORTS site is in active remediation, the project has raised concerns about potential health and environmental risks associated with the site's history as a uranium enrichment plant. SB Energy told the Guardian in August that it is "committed to paying for accelerated cleanup and remediation at the site" and that the company "performs thorough site reviews and due diligence for each of our infrastructure projects, including soil sampling."

SB Energy said in October that it would begin initial clearing and grading work for the campus’s first phase.

Project Matador — Texas
Construction work at Project Matador's 17GW Private Power Campus
Construction work at Project Matador's 17GW Private Power Campus

Fermi America via PR Newswire

Fermi America's Project Matador, also called HyperGrid, is an AI data center and private power campus being built near Amarillo, Texas.

Fermi, which was co-founded in 2025 by former Texas Gov. and US Energy Secretary Rick Perry, said it is pursuing roughly 17 gigawatts of private power for the campus, up from the initially planned 11 gigawatts. That means the campus would generate much of its own electricity on-site rather than relying entirely on the public grid. The company says 6 gigawatts have been permitted so far.

Fermi has a 99-year land lease with the Texas Tech University System for the core site, and the project could span roughly 8,400 acres at full build-out. Fermi says construction is underway, with completion planned for the 2030s, and AI cloud company TensorWave has signed a 15-year lease expected to generate about $6.5 billion in contracted revenue for the first phase. Fermi is also developing a cooling system designed to substantially reduce water use.

The company was hit with a class action lawsuit earlier this year. The investor lawsuit alleges Fermi misled investors about the status and prospects of Project Matador; its shares fell after Amazon withdrew a $150 million construction advance in December 2025.

Fermi America said three gas turbines arrived at the site in October.

SpaceX, Meta, Google, Oracle, Fermi America, CloudBurst, and xAI did not immediately respond to a request for comment from Business Insider. SB Energy did not offer a comment.

Read the original article on Business Insider

The states with the fewest and most data centers, ranked

23 October 2026 at 17:56
Aerial view of a large industrial facility with rooftop equipment, exterior construction, roads, parking lots, and surrounding greenery.
An Amazon Web Services data center under construction in Sterling, Virginia. Virginia has the highest number of data centers of any state.

Anna Moneymaker/Getty Images

  • The AI boom is accelerating data center development across the US.
  • Even states with few data centers are attracting major hyperscale projects.
  • Here's how all 50 US states rank by their number of operational data centers.

The data center business is booming in the US, and some states are feeling it more than others.

Data centers, which house the computing machines that power digital services, have been around for decades. However, the amount of computing power required to fuel the AI boom has accelerated their development and brought the industry into the mainstream.

This ranking was compiled by analyzing data from Data Center Map, an industry source that maps data center locations around the world. It shows a snapshot of its US database as of October 2026. Business Insider limited this ranking to fully operational data centers.

Data Center Map compiles its data from multiple sources and mainly tracks cloud and colocation service providers. Each data center it tracks has to have an initial capacity of at least 10 cabinets. While some states have hyperscale AI data centers, others have relatively small operations.

Firstly, data center operators and service providers add their own listings to market themselves. Data Center Map also monitors external databases and manually identifies any missing operators. It also handles requests from users who identify missing or outdated listings.

There is no federal requirement for data centers to register in a central database, so the figures should not be interpreted as a complete census of every data center in the country. Data Center Map also says it has a "more limited coverage on enterprise and government data centers."

Last year, Business Insider created its own US data centers map, which included estimated power usage, as part of an investigation into the industry.

Here are the states with the most operational data centers, ranked from least to most.

50. Vermont
Aerial view of a small town with a white church steeple, forested hills, and mountains under a cloudy sky.
Stowe, Vermont.

Jim Espey/Getty Images

Number of operational data centers: 3

Vermont's three operational data centers are located in Stowe, South Burlington, and Williston. The state has a limited electrical grid, according to the Vermont Natural Resources Council.

49. Alaska
Aerial view of downtown Anchorage with residential neighborhoods, high-rise buildings, green parkland, and Cook Inlet waterfront.
Anchorage, Alaska.

Jacob Boomsma/Getty Images

Number of operational data centers: 4

Half of Alaska's operational data centers are located in Anchorage. The University of Alaska Fairbanks said that the high cost of electricity and network connections are some of the challenges for data center buildout in the state.

48. South Dakota
Waterfalls cascade over rocky ledges beside a stone-and-wood structure under a partly cloudy sky.
Sioux Falls, South Dakota.

Lindsay Guido/Getty Images/iStockphoto

Number of operational data centers: 5

Most of South Dakota's data centers are in Sioux Falls. Lawmakers in South Dakota rejected proposals for industry tax incentives in 2026 while enacting new restrictions on electricity and water use, according to the South Dakota Searchlight.

46. Maine (tie)
Green steel truss bridge spans a calm river beside rocky banks, vegetation, and red brick industrial buildings.
Brunswick, Maine.

Photo Italia LLC/Getty Images/iStockphoto

Number of operational data centers: 6

Maine has data centers in Portland, Brunswick, and Bangor.

Maine's Gov. Janet Mills signed an order in April to establish a data center advisory council to advise on large-scale data center development.

46. Delaware (tie)
Wilmington, Delaware.
Wilmington, Delaware.

Bo Shen/Getty Images

Number of operational data centers: 6

Half of the data centers in Delaware are located in Wilmington.

Delaware Gov. Matt Meyer signed legislation in August requiring data centers to generate their own energy and cover infrastructure costs, WHYY reported.

44. West Virginia (tie)
Steel arch bridge spans a river beside a downtown skyline at dusk with reflections on the water.
Charleston, West Virginia.

Sean Pavone/Getty Images/iStockphoto

Number of operational data centers: 7

West Virginia's data centers are located in South Charleston, Bridgeport, Charleston, Star City, Petersburg, Nitro, and Berkeley Springs.

Having previously lacked the regulatory framework to approve or deny large-scale projects, Gov. Patrick Morrisey announced a data center development plan in August.

44. Rhode Island (tie)
Aerial view of downtown Providence skyline beside the Providence River under a partly cloudy blue sky.
Providence, Rhode Island.

Wirestock/Getty Images

Number of operational data centers: 7

All of Rhode Island's data centers are located in Providence.

The Providence Journal reported in April that one of the reasons Rhode Island has not been as attractive to data center developers is high energy costs.

42. Montana (tie)
Elevated view of a city skyline with tree-filled neighborhoods and low hills under a cloudy sky.
Billings, Montana.

George Dodd/Getty Images

Number of operational data centers: 8

The majority of Montana's data centers are located in Billings.

Big Sky Digital Infrastructure is developing a 5,100-acre campus 30 miles north of Billings.

42. Hawaii (tie)
Honolulu waterfront skyline at dusk with Aloha Tower lit beside harbor water and office buildings.
Honolulu, Hawaii.

otman lazrak/Getty Images

Number of operational data centers: 8

Over half of Hawaii's data centers are in Honolulu.

The Honolulu Civil Beat reported that there are currently no hyperscale data centers in Hawaii.

41. Arkansas
Urban park with a winding boardwalk over water, green trees, and a modern skyline beneath cloudy sunlight.
Little Rock, Arkansas.

Brandon Olafsson/Getty Images

Number of operational data centers: 9

The city with the most data centers in Arkansas is Little Rock.

Google announced its first data center in the state, to be located in West Memphis, in 2025, while Avaio is developing a large-scale one near Little Rock.

39. New Hampshire (tie)
Aerial view of a riverfront city with brick mill buildings, downtown towers, highways, and autumn trees.
Manchester, New Hampshire.

ChrisBoswell/Getty Images/iStockphoto

Number of operational data centers: 10

Manchester has three data centers, while the rest are spread across seven different cities.

A proposed data center in Nottingham was withdrawn earlier this year following local opposition, the New Hampshire Bulletin reported.

39. Idaho (tie)
Downtown Boise skyline and the Idaho State Capitol are lit by sunset beneath dramatic storm clouds.
Boise, Idaho.

knowlesgallery/Getty Images

Number of operational data centers: 10

Four of Idaho's 10 data centers are located in Boise, followed by three in Coeur d'Alene.

Meta plans to operate a $1.2 billion data center in Kuna, which it broke ground on in 2022.

38. Louisiana
Workers in safety vests walk through a muddy construction site with cranes, barriers, and steel framing in the background.
Construction underway at River Bend, Hut 8's AI data center campus in Saint Francisville, Louisiana.

Kathleen Flynn/Getty Images

Number of operational data centers: 12

The majority of Louisiana's data centers are located in New Orleans and Baton Rouge.

Meta is building its largest-ever data center in Richland Parish, which will house the multi-gigawatt AI cluster Hyperion.

37. North Dakota
Parked cars line a downtown street with historic storefronts, a skyway, and a modern high-rise under blue sky.
Fargo, North Dakota.

gnagel/Getty Images

Number of operational data centers: 13

Four of North Dakota's data centers are located in Fargo, followed by three in Ellendale.

There are some large-scale data center projects in the state, such as Applied Digital's 280-megawatt campus near Harwood.

36. Kansas
Terraced concrete spillway and pedestrian bridge overlook a pond in a landscaped park under a clear blue sky.
Lenexa, Kansas.

Wirestock/Getty Images/iStockphoto

Number of operational data centers: 15

Nearly half of Kansas' operational data centers are located in Lenexa, which has seven of the state's 15 facilities.

Kansas is experiencing a surge in plans for large-scale data center development, including one by Dubai-based developer Damac Properties in Edgerton, Kansas, The Wall Street Journal reported.

35. Mississippi
Industrial facility grounds with utility poles, work trucks, and a Southaven water tower behind a large white building.
Work continues on a data center being built by SpaceXAI in Southaven, Mississippi.

Brandon Dill / AFP via Getty Images

Number of operational data centers: 16

Six of Mississippi's operational data centers are located in Canton.

Amazon announced in April this year that it increased its total planned investment in its Mississippi data centers, including in Canton, to $25 billion.

33. New Mexico (tie)
Desert roadside gate and fence stand before a dry hillside and rugged mountains under a clear blue sky.
Los Lunas, New Mexico.

Lily Kimei/Getty Images

Number of operational data centers: 20

Over half of New Mexico's data centers are located in Los Lunas.

Meta opened a data center in Los Lunas in 2019, which it has since expanded.

33. Connecticut (tie)
Elevated view of an urban plaza with leafless trees, surrounding buildings, and an American flag under a cloudy sky.
Stamford, Connecticut.

stockphoto52/Getty Images/iStockphoto

Number of operational data centers: 20

Connecticut's 20 operational data centers are spread across multiple cities, with the highest concentration in Stamford.

The Connecticut Mirror reported that lawmakers said the state's high electricity costs make it unattractive to data center developers.

32. Wyoming
Black cattle graze among sagebrush on a grassy hillside beneath a cloudy sky.
Cows graze in the area where the Prometheus Hyperscale Data Center will be built east of Evanston, Wyoming.

Natalie Behring/Getty Images

Number of operational data centers: 22

All but two of Wyoming's data centers are located in Cheyenne, with the other two in Casper and Afton.

In 2012, Microsoft built its first data center in Cheyenne and has expanded its footprint there multiple times since.

31. Alabama
Dusk Over The Downtown Urban City Center of Huntsville Alabama
Dusk Over The Downtown Urban City Center of Huntsville Alabama

ChrisBoswell/Getty Images/iStockphoto

Number of operational data centers: 23

Huntsville has the most operational data centers in Alabama.

Meta broke ground on its Huntsville campus in 2018.

30. South Carolina
Crowd gathers before a bunting-decorated stage labeled “MONCKS CORNER,S.C.” under a cloudy sky.
Moncks Corner, South Carolina.

Bloomberg/Getty Images

Number of operational data centers: 26

Moncks Corner has the most operational data centers in South Carolina, accounting for 11 of the state's 26 facilities.

Google has three facilities in South Carolina, where it first made its footprint in 2007.

29. Maryland
Aerial view of downtown Baltimore skyline with urban buildings, roads, greenery, and water under a partly cloudy sky.
Baltimore, Maryland.

Majestic_Aerials/Getty Images

Number of operational data centers: 27

Baltimore has the most operational data centers in Maryland, followed by Frederick.

Amazon is developing a new data center campus in Frederick, Maryland.

28. Kentucky
Aerial view of downtown Louisville skyscrapers and hotels, including the Galt House Hotel, under a clear blue sky.
Louisville, Kentucky.

Nicholas Klein/Getty Images

Number of operational data centers: 32

Louisville has the most operational data centers in Kentucky, with 13 of the state's 32 facilities.

Mason County, Kentucky, recently signed a development agreement for a Meta hyperscale data center, as reported by LEX 18.

27. Utah
Fenced industrial buildings sit beyond a dirt road and scrubland under a cloudy mountain skyline.
Meta data center campus complex in Eagle Mountain.

Charles-McClintock Wilson/NurPhoto via Getty Images

Number of operational data centers: 35

Salt Lake City has the most operational data centers in Utah, followed by Bluffdale, Eagle Mountain, and West Jordan.

Meta operates a campus in Eagle Mountain, and the National Security Agency operates one located near Bluffdale.

25. Oklahoma (tie)
Aerial view of a large construction site with earthmoving equipment, parked cars, trailers, and cleared land.
Construction of a 500-acre data center in Owasso, Oklahoma.

Jim West/UCG/Universal Images Group via Getty Images

Number of operational data centers: 36

Most of Oklahoma's data centers are located in Tulsa, followed by Oklahoma City and Pryor.

Google operates a facility in Pryor and is developing additional locations in the state.

25. Nebraska (tie)
Google logo appears on a white industrial building beside utility structures, poles, grass and a cloudy sky.
Google data center in Papillion, Nebraska.

Misty Prochaska for The Washington Post via Getty Images

Number of operational data centers: 36

Omaha has the most operational data centers in Nebraska, with 11, followed by Papillion and Springfield, each with 8.

Google has campuses in Lincoln, Omaha, and Papillion.

24. Wisconsin
Aerial view of a large industrial campus under construction with retention ponds, roads, and a sunset horizon.
Microsoft's data center project in Mount Pleasant, Wisconsin, on November 13, 2025.

Joe Timmerman/Wisconsin Watch via Getty Images

Number of operational data centers: 41

Wisconsin's 41 data centers are spread across several cities, with Milwaukee and Madison hosting the most.

Microsoft finished building an AI data center in Mount Pleasant in June.

23. Massachusetts
Aerial view of a neighborhood with houses, tree-lined streets, and a large black industrial building.
The Markley Group data center in Lowell.

Danielle Parhizkaran/The Boston Globe via Getty Images

Number of operational data centers: 46

Marlborough has the most operational data centers in Massachusetts, with six, followed by Boston with five, and Cambridge and Waltham with four each.

CBS News reported that the biggest, the Markley data center, is in Lowell.

21. Missouri (tie)
Downtown Kansas City skyline rises beyond green parkland and roads in warm evening light.
Kansas City, Missouri.

Garrett Smith/Getty Images

Number of operational data centers: 47

Missouri's 47 operational data centers are spread across eight cities, with Kansas City accounting for most of them.

Axios reported in September that most of Missouri's planned data center expansion is concentrated in the Kansas City metropolitan area, citing research by Cleanview.

21. Minnesota (tie)
Spoonbridge and Cherry sculpture spans a pond in a green park with the Basilica of Saint Mary in the background.
Minneapolis, Minnesota.

GummyBone/Getty Images

Number of operational data centers: 47

Minnesota's 47 data centers are spread across 21 cities, with Minneapolis accounting for 15, followed by Eden Prairie, St. Paul, Shakopee, and Minnetonka.

Google announced earlier this year that it plans to build a data center in Pine Island.

20. Nevada
Aerial view of a large construction site with a partially built structure in a dry hilly desert landscape.
The Tahoe Reno Industrial Center. Several companies are building facilities in an area about 15 miles east of downtown Reno in this development project named the Tahoe Reno Industrial Center including data storage facilities from Switch. Apple is also building a data storage facility nearby in the Reno Technology Park (Photo by David Butow/Corbis via Getty Images)

David Butow/Corbis via Getty Images

Number of operational data centers: 51

More than half of Nevada's data centers are located in Las Vegas.

Switch has plans to expand its Citadel Campus at the Tahoe Reno Industrial Center, which the company says will have gigawatts of power capacity upon completion.

19. Indiana
NEW CARLISLE, INDIANA - OCTOBER 2: In this handout provided by Amazon, a technician works at an Amazon Web Services AI data center in New Carlisle, Indiana on October 2, 2025.
A technician works at an Amazon Web Services AI data center in New Carlisle, Indiana.

Noah Berger/Getty Images via Amazon Web Services

Number of operational data centers: 51

Indiana's 51 operational data centers are spread across 11 cities, with Indianapolis leading and New Carlisle following.

18. Tennessee
Industrial construction site behind a chain-link fence with heavy equipment, trucks, tall towers, and drifting smoke.
Construction at an xAI data center in Memphis on April 25, 2025.

Brandon Dill for The Washington Post via Getty Images

Number of operational data centers: 53

Nashville has the largest concentration of Tennessee's 53 operational data centers.

Elon Musk's xAI describes its Colossus facility in Memphis as the world's largest AI supercomputer.

16. Michigan (tie)
Aerial view of a large industrial construction site with cranes, white-roofed buildings, and surrounding farmland.
Construction of a data center developed by Related Digital for Oracle and OpenAI in Saline, Michigan.

: Jim West/UCG/Universal Images Group via Getty Images

Number of operational data centers: 58

Michigan's 58 data centers are spread across 27 cities, with Southfield accounting for the most.

Part of the Stargate Project, Related Digital kicked off construction of a $16 billion data center called "The Barn" in Saline Township in June.

16. Colorado (tie)
Heavy earthmoving machines work on a dirt mound behind a chain-link fence at a construction site.
QTS constructs a data center in Aurora in 2025.

RJ Sangosti/MediaNews Group/The Denver Post via Getty Images

Number of operational data centers: 58

There are 14 data centers in operation in Denver, followed by 11 in Englewood, 7 in Centennial, and 7 in Colorado Springs.

QTS is expanding its 65-acre data center campus in Aurora, Colorado, Colorado Public Radio reported in July.

15. Iowa
Blue and gray edged facility building at 9100 behind a black security fence under clear sky.
The "Edged Des Moines" data center nears completion in Altoona, Iowa.

Leon Neal/Getty Images

Number of operational data centers: 69

Altoona and West Des Moines are among Iowa's leading data center locations, alongside Council Bluffs and Des Moines.

Google has had a campus in Council Bluffs since 2007, recently invested in its expansion, and has also kicked off a new one in Cedar Rapids.

14. North Carolina
Modern gray building with vertical concrete panels, flags, parked cars, landscaped rocks, trees, and lawn under cloudy sky.
Meta's data center in Forest City, taken in 2010 when it was formerly a Facebook data center.

Rainier Ehrhardt/Getty Images

Number of operational data centers: 76

Charlotte has 24 data centers, the most in North Carolina, followed by Raleigh, Maiden, and Lenoir.

Apple operates a data center in Maiden, according to The Charlotte Observer. Google and Meta also operate data centers in the state.

12. Pennsylvania (tie)
Two large cooling towers release steam behind an industrial facility construction site under a partly cloudy sky.
An Amazon Web Services construction project in Berwick.

Paul Weaver/SOPA Images/LightRocket via Getty Images

Number of operational data centers: 78

Pittsburgh and Philadelphia have the largest concentrations of operational data centers in Pennsylvania.

In 2025, Amazon announced plans to invest at least $20 billion in the state to expand its data center operations.

12. New Jersey (tie)
Large windowless concrete building sits behind a black fence along a quiet street under a clear blue sky.
The Equinix NY5 data center in Secaucus, New Jersey.

Kena Betancur/Getty Images

Number of operational data centers: 78

Secaucus and Piscataway are two of New Jersey's main data center hubs, alongside Jersey City.

Equinix operates a 129,436-square-foot data center in Secaucus, known as NY5.

11. Florida
Aerial view of a modern glass and concrete facility with orange accents beside a multi-lane highway.
The HostDime data center in Eatonville, Florida, is north of Orlando.

Paul Hennessy/SOPA Images/LightRocket via Getty Images

Number of operational data centers: 113

Florida's 113 operational data centers are spread across 27 locations, with Miami accounting for the most at 33, followed by Tampa with 20, Jacksonville with 13, and Orlando with nine.

Data center provider HostDime has been based in the state since 2003 and is building a 100,000-square-foot facility in Eatonville.

10. Arizona
A data center under construction under a blue sky.
A QTS data center under construction in Phoenix in 2024.

Bloomberg/Getty Images

Number of operational data centers: 114

Phoenix contains 34 of Arizona's data centers, followed by Goodyear with 24, and Chandler with 17.

ABC 15 reported that companies such as Meta, Apple, and Microsoft all have campuses in Arizona.

9. Georgia
Aerial view of a large industrial complex under construction surrounded by parking lots, roads, forest, and power infrastructure.
A QTS data center complex in Fayetteville, Georgia, in 2024.

Bloomberg/Getty Images

Number of operational data centers: 123

Atlanta has the largest concentration of operational data centers in Georgia, with 43 facilities, followed by Lithia Springs with 25 and Social Circle with 10.

Google built its first data center in Georgia in 2007, and QTS is has one in Fayetteville.

8. Washington
Large industrial warehouse complex with flat roofs surrounded by trees and roads under a cloudy sky.
The Sabey Data Centers' Seattle Data Center campus in Tukwila, Washington.

Bloomberg/Getty Images

Number of operational data centers: 132

Quincy has the largest concentration of operational data centers in Washington, with 33 facilities, followed by Seattle with 31, Tukwila with 16, and East Wenatchee with 11.

Washington's Department of Ecology says Quincy and Wenatchee are popular spots because they have cheaper, reliable energy.

7. Oregon
Modern white industrial building with large dark windows, concrete walkway, rocks, and sparse landscaping under a clear blue sky.
The Facebook Inc. Prineville Data Center stands in Prineville, Oregon, U.S., on Monday, April 28, 2014. The Facebook Prineville Data Center features leading energy-efficient technology, including features such as rainwater reclamation, a solar energy installation for providing electricity to the office areas and reuse of heat created by the servers to heat office space. Photographer: Meg Roussos/Bloomberg via Getty Images

Bloomberg/Getty Images

Number of operational data centers: 141

Hillsboro has the most operational data centers in Oregon, followed by Boardman, and then Umatilla and Prineville.

Oregon is home to Meta and Google's first-ever data centers: Meta built its in Prineville, and Google's The Dalles.

6. Illinois
Modern glass office building stands behind a wide road with parked cars and trees under a clear sky.
A CyrusOne data center in Aurora, Illinois.

Bloomberg/Getty Images

Number of operational data centers: 143

Chicago has the largest concentration of operational data centers in Illinois, with 49 facilities, followed by Elk Grove Village, which has 24. Lombard, Aurora, and DeKalb each have seven.

Companies such as Digital Realty Trust, Microsoft, Meta, and CyrusOne operate in Illinois.

5. New York
Gray industrial facility behind black security fencing, with autumn vegetation and trees under an overcast sky.
The JPMorgan Chase data center in Orangeburg, New York.

Kena Betancur/Getty Images

Number of operational data centers: 149

New York City is home to a large share of the state's operational data centers, with additional concentrations in Buffalo and Albany.

In July, New York was the first state to enact an executive order that imposed a statewide yearlong moratorium on hyperscale AI data centers.

4. Ohio
Aerial view of a large industrial construction site with rooftop equipment, rows of white units, cars, and surrounding fields.
The 5C Data Centers CMH01 on October 18, 2026 in Springfield, Ohio.

Michael M. Santiago/Getty Images

Number of operational data centers: 189

Columbus has the largest concentration of operational data centers in Ohio, with Johnstown, Hilliard, and Cleveland also home to significant numbers of facilities.

Intel announced plans in 2022 for a major semiconductor manufacturing facility in New Albany, a suburb in central Ohio known as the "Silicon Heartland," which is already home to data centers operated by Amazon, Google, and Meta, as Business Insider previously reported.

3. California
Aerial view of city blocks with modern buildings, streets, cars, and a waterfront pier beside the bay.
The Digital Realty SFO12 Data Center, center in the Rincon Hill neighborhood of San Francisco.

Stephen Lam/San Francisco Chronicle via Getty Images

Number of operational data centers: 285

Santa Clara has the largest concentration of operational data centers in California, with 75 facilities, followed by Los Angeles with 51 and San Jose with 26.

Major operators in Santa Clara include Digital Realty, Equinix, CoreSite, and Vantage Data Centers.

2. Texas
Aerial view of a large industrial building under construction amid red dirt earthworks, cranes, equipment, and surrounding forest.
The Stargate Oracle AI data center under construction on August 26, 2026 in Abilene, Texas.

Brandon Bell/Getty Images

Number of operational data centers: 358

Of Texas's 358 operational data centers, 58 are located in Dallas, 42 in Houston, and 39 in San Antonio.

Earlier this year, Business Insider, citing research from Jones Lang LaSalle, reported that Texas is on track to become the largest data center market in the world by 2030.

Texas is home to some of the world's largest planned data center projects, such as Fermi America's Project Matador.

1. Virginia
Aerial view of large industrial data center buildings beside a river and surrounding suburban neighborhoods.
An Amazon Web Services data center in Aldie, Virginia.

Bloomberg/Getty Images

Number of operational data centers: 452

Northern Virginia is not only the largest data center market in the US but also in the world. Major operators in the state include Equinix, Digital Realty, Microsoft, Vantage Data Centers, and Amazon.

Ashburn has the largest concentration of operational data centers in Virginia, with 102 facilities, followed by Sterling with 84 and Manassas with 60.

Read the original article on Business Insider

The Friday File: Microsoft; European satellite; SpaceX

23 October 2026 at 09:00

Mobile World Live (MWL) brings you our top three picks of the week, as Microsoft backed out of its UK data centre deal with Nscale, four European telco heavyweights confirmed plans to explore a joint satellite spectrum bid and SpaceX targeted a launch in 2028 for its direct-to-device (D2D) service.

Microsoft pulls out of Nscale UK data centre deal

What happened: Microsoft reportedly pulled out of an agreement to lease capacity at Nscale’s planned AI data centre in Loughton, Essex, after delays to its electricity connection pushed expected supply into the 2030s.

Why it matters: The 50MW facility was announced in 2025 as part of Nscale’s £2.5 billion UK investment commitment. Microsoft planned to occupy the entire site and deploy a supercomputer containing around 23,000 Nvidia GB300 chips. According to Reuters, Nscale said it remained “committed to both the Loughton project and the UK” and was exploring alternative power sources. It added its wider relationship with Microsoft remained strong, with the companies continuing to work together in Norway, Portugal and the US.

In February, an investigation by The Guardian found the Loughton site was still operating as a scaffolding yard, exposing a widening gap between the UK’s AI investment announcements and its ability to deliver the infrastructure required. Roderick Beck, a subsea and network capacity specialist, and VP of business development at UCC Hudson Bore, said “the big and growing order backlogs in the AI data centre sector reflect not just strong demand, but the difficulty of building these data centres and equipping them”. He added: “The construction, power, and GPU supply chains are extremely stressed.” Meanwhile, David Johnson, CEO of Greater London Industrial, noted “this is not an isolated case”, pointing to research from Roadnight Taylor which found half of UK data centre developers expected grid connections within one to two years, while many faced waits of three to eight years. He concluded: “Grid capacity is now as important to growth as planning consent. We need to treat it that way.”

European operators confirm satellite spectrum move

What happened: Deutsche Telekom, Orange, Telefonica and Vodafone Group signed a letter of intent to explore a joint bid for spectrum earmarked for Mobile Satellite Services (MSS), as operators look to expand D2D connectivity.

Why it matters: The quartet stated a joint approach would support open, non-discriminatory access to satellite connectivity, while reducing market fragmentation and boosting consumer choice. They plan to establish ground infrastructure, coordination and monitoring functions without investing directly in a satellite constellation. A satellite partner has yet to be selected.

Counterpoint Research senior analyst Subhadip Roy noted the move comes ahead of the expiry of existing 2GHz spectrum authorisations held by Viasat and EchoStar in May 2027, with a new allocation framework being developed by the European Commission. He added the move takes D2D beyond satellite partnerships to the question of “who controls spectrum and how satellite connectivity becomes part of mobile networks”. Meanwhile, PP Foresight’s Paolo Pescatore said success depends on making satellite coverage “a seamless extension of mobile connectivity”. He added execution, device compatibility and pricing must give customers “a compelling reason to pay, along with reassurance they can stay connected in more places”.

SpaceX targets early 2028 for own D2D service launch

What happened: SpaceX revealed plans to launch its own D2D service in early 2028, following deployment of its second-generation Starlink Mobile satellites in 2027 and integration of additional spectrum.

Why it matters: On the company’s Q3 earnings call, president Gwynne Shotwell said its spectrum acquisition and the Federal Communications Commission’s approval to launch 15,000 next-generation V2 satellites would “pave the way for Starlink Mobile to become a major mobile carrier in the US”. Earlier this month, SpaceX agreed to buy up to 14MHz of paired spectrum in the 800MHz band from Grain Management. The company also plans to use ground-based femtocells to complement satellite coverage.

Ananth Theivendrapoopathy, global head of pricing, product and commercial strategy at Lycamobile Group, said SpaceX could compete “without having to replicate the entire physical infrastructure of traditional mobile operators”, adding this could provide “a significant advantage through a different network cost structure”, although urban capacity and indoor coverage challenges remain. He argued the move also raises regulatory questions over whether satellite providers competing directly with mobile operators should face comparable regulatory obligations. He noted Deutsche Telekom, Orange, Telefonica and Vodafone Group’s joint approach to satellite connectivity, alongside mounting calls for European sovereignty, become “important considerations”.

Separately this week, Elon Musk revealed plans to explore a potential merger between SpaceX and Tesla in a combination that could bring satellite connectivity, vehicles and AI infrastructure under one umbrella.

The post The Friday File: Microsoft; European satellite; SpaceX appeared first on Mobile World Live.

Microsoft AI tool twice as accurate as doctors in complex diagnoses

23 October 2026 at 06:12

Microsoft researchers say an AI tool that diagnoses patients step by step, as doctors do, was more than twice as accurate as general physicians at solving complex medical cases, according to a study published on Thursday in Science.

The model identifies and coordinates the questions that should be asked of a patient, as well as the exams and tests that should be ordered, using an “orchestrator” that organizes how AI will tackle a problem by employing a simulated panel of clinical experts collaborating to solve diagnostic cases, according to the report.

Existing medical AI models typically take an all-at-once approach that examines all of a patient’s symptoms, lab results and imaging studies to generate a diagnosis.

AI mimics doctors’ step-by-step approach

With the orchestrator coordinating the steps to reaching a diagnosis, the AI model first decides what to ask about the patient’s history and what is significant in the physical exam. Based on what it learns, it decides which tests to order, considers the results, and orders further testing as appropriate.

All the while, it is updating its working hypotheses and plans, the research leaders said in an interview.

Tasked with diagnosing more than 300 highly unusual and confusing medical dilemmas, the model employing the diagnostic orchestrator was more than twice as accurate at “working up” the patient and determining the diagnosis as general physicians using textbooks and the internet.

The tool also outperformed human physicians when presented with scenarios drawn from a major database of emergency room admissions.

Assessments comparing these types of older systems to human doctors usually use multiple-choice questions, the researchers said.

“AI has become very good at getting a 100% pass rate on those,” said Dr. Dominic King, the corporate vice president of the health unit at Microsoft AI, whose team is developing the new technology.

“But of course, that’s not real-world. No patient ever came to see me with a nice summary.”

The researchers also found that diagnostic processes cost less when the orchestrator designs the work-ups than when human doctors do.

“We’re not just measuring the accuracy of the systems. We’re also measuring how judiciously and carefully it goes through a diagnostic work-up,” said Harsha Nori, head of AI at Microsoft AI Health.

In a collaboration with Beth Israel Deaconess Medical Center in Boston, the researchers will next test the tool’s ability to triage patients in emergency department waiting rooms.

❌